EKT repairs, installs and replaces washer vats in bleach plants. To date EKT has custom manufactured and replaced five existing concrete and tile vats with fibreglass.
A 10 day schedule made changing from concrete to fiberglass viable during an annual shutdown.
-
Final Assembly Lowered Into Place
Vat is hoisted to floor in three sections (due to hoisting hatch and transportation limitations) and assembled in a staging area. this shows the assembled vat being hoisted into place
-
Attention to Detail
Quality control at every step of the way