-
Valley Camp Potash
EKT completed a turnkey 9,000 TPH unit train unloading system. The system connected directly to an existing ship loading operation. The project included a dumper, car unloader, conveyors and controls
-
Chip Unloading, Storage and Reclaim Facility
- Two truck dumpers
- Four thousand feet of conveyor
- Two seventy thousand ton stacker reclaimers
- CTS (Chip Thickness & Screening) system